Construction

Before Construction

GENERAL

 

The following is required and must be approved by the Landlord before construction can begin on any project in St Vital Centre.

Permits and Insurance:

  • Clearance from WCB.
  • Proof of Insurance coverage: Commercial general liability insurance against personal and bodily injury including death and property damage in an amount not less than $5,000,000 per occurrence.
  • Your insurance policy must name 20 VIC Management Inc., OPB Realty Inc. and the Ontario Pension Board as additionally insured.
  • Fire and standard extended coverage endorsement perils against water damage however caused.
  • Business interruption insurance, including loss of profits.
  • Occupational Heath and Safety Concurrence form must be signed and dated (available at our office)
  • A designated substances survey must be completed. Contact: Pinchin Environmental at 204.452.0983 or AMEC Earth and Environmental at 204.488.2997
  • A copy of the building permit or application for same delivered to our office.

Mandatory Trades:

The following are mandatory trades for St. Vital Centre.

  • Sprinklers, Vipond 204 783-2420
  • Fire alarm, Bison 204-237-3473
  • Electrical outside of premise, Wes Can, Pat 204 479-3739
  • Air balancing Air Movement, 204 233-7456
  • HVAC controls, Black and McDonald 204 786-5667

Any questions should be directed to:

Don Lombaert
Operations Manager
Ph. 204 258-7022
Fax 204 257-2311
Email dlombaert@20vic.com

Click here for PDF

(updated April 2010)